| Design of new-type rock drilling hoisting suspension system for 2 000 m large diameter ultra-deep shaft |
| Received:May 06, 2022 Revised:May 25, 2022 |
| View Full Text View/Add Comment Download reader |
| DOI: |
| KeyWord:ultra-deep shaft; equipment selection; new hoisting system; sinking winch; hoisting safety |
| Author | Institution |
| ZHAO Xingdong |
东北大学 深部金属矿采动安全实验室 |
| WU Tong |
东北大学 深部金属矿采动安全实验室 |
| LI Wenguang |
山东黄金矿业莱州)有限公司三山岛金矿 |
| DENG Yaozeng |
山东黄金矿业莱州)有限公司三山岛金矿 |
|
| Hits: 1264 |
| Download times: 955 |
| Abstract: |
| To meet the needs of rapid and safe construction of large-diameter and ultra-deep shafts, combined with the technical problems existing in the current shaft construction, the rock drilling hoisting suspension system is designed from three aspects: equipment selection, hoisting system layout and hoisting safety measures. The system adopts VII type sinking headframe, ultra-deep shaft sinking hoists, and other new equipment, and establishes the safety monitoring system of the hoisting device to achieve the goal of rapid and safe construction of a large-diameter ultra-deep shaft. The result shows that the new hoisting and suspension equipment is used together with the safety monitoring system to achieve a good effect of 120 m monthly footage in the construction of ultra-deep shaft in Sanshandao Gold Mine, improve the construction efficiency, ensure the safety of the shaft sinking, and provide a reference for the construction of the ultra-deep shaft. |