Research and Application on Optimization of medium and deep hole blasting parameters in Xingshan Iron Mine |
Received:April 22, 2022 Revised:April 25, 2022 |
View Full Text View/Add Comment Download reader |
DOI: |
KeyWord:Medium deep hole blasting; Blasting parameter optimization; Bulk rate; Underground mines; No-pillar segmented caving method |
Author | Institution |
WANG Lijun |
首钢集团有限公司矿业公司杏山铁矿 |
DONG Xu |
首钢集团有限公司矿业公司杏山铁矿 |
LI Yaozong |
首钢集团有限公司矿业公司杏山铁矿 |
FENG Xinqi |
首钢集团有限公司矿业公司杏山铁矿 |
|
Hits: 468 |
Download times: 436 |
Abstract: |
Xingshan Iron Mine is an underground mine, and the high blasting block rate has always affected production efficiency. Combining with the actual production and geological conditions of Xingshan Iron Mine, this paper analyzes the reasons for the formation of large blocks in the process of blasting and falling ore from the aspects of hole layout, filling length, and detonation method. The research results show that accurate analysis of geological conditions and rock structure is very important for the selection of blasting parameters. The parameter optimization of the triangular hole arrangement, the hole filling not less than 400 mm, and the small resistance line and the large hole spacing can effectively reduce the large block rate. According to the field measurement, the row spacing is set to 1.9 m, the side hole angle is 57°, the ore collapse step is 3.8 m, and the average block rate of the stope is reduced by 40%. Shan Iron Mine has a problem of high block rate in engineering practice. |