Repair treatment of deformed chlorite section support
Received:March 14, 2013  Revised:March 20, 2013
View Full Text  View/Add Comment  Download reader
DOI:
KeyWord:chlorite tunnel;deformed;Repair
  
AuthorInstitution
wang changgui 河北邯邢矿冶设计院有限公司
Hits: 612
Download times: 725
Abstract:
      According to ekou iron mine south west belt transportation tunnel of deformed chlorite pressure, according to the deformed degree of different design with different reinforcement schemes, the long anchor rod, anchor rope, steel arch shelf, spray with network support, as well as the landslides area increase pipe roof design, and construction key points are put forward. According to the design process of the safe operation of the belt tunnel does not appear damage phenomenon. Draw lessons from the experience, promoting chlorite geological conditions in tunnel design and construction attention, and if there is a pressure damage phenomenon, how to take effective reinforcement measures, both to ensure the construction safety, and to achieve reinforcement effect.
Close