Intelligent Mine

Fast switching mechanism of underground equipment signal transmission system
  LYU Xiao,ZHANG Yuansheng,YU Qianxiang,LI Ruoxi,ZHAO Dazhuang,LIU Xiaoxuan,CHEN Suohan and WANG Xianlong
  2022,74(5):1-4 [Abstract]  [View PDF(1.03 M)]
  
An intelligent automatic analysis system of ore fragmentation in blasting based on deep learning
  XU Wei,DUAN Yun and WANG Bonan
  2022,74(5):5-12 [Abstract]  [View PDF(3.28 M)]
  
Automatic energy capture and wireless smart sensing technology for mines at Yax copper-nickel mine
  YANG Nan,WANG JiNong and ZHANG Da
  2022,74(5):13-18 [Abstract]  [View PDF(1.86 M)]
  

Mining Engineering

Numerical simulation of stope structural parameters of bauxite mine
  CUI Song,YU Bin,HOU Guoquan and GUO Lijie
  2022,74(5):19-24 [Abstract]  [View PDF(1.60 M)]
  
Optimization of backfilling technology in a domestic iron mine
  chenxinzheng,, and
  2022,74(5):25-30 [Abstract]  [View PDF(1.76 M)]
  
Investigation on comprehensive evaluation and analysis of mine ground pressure activities during mining process
  SHI Feng,ZHANG Da,WU Yafei,LI Kun and WANG Ping
  2022,74(5):31-36 [Abstract]  [View PDF(1.51 M)]
  
New-type mining technology of top and bottom pillars and corners and application in a lead-zinc mine
  LONG Yi,SHI Wenhao,LI Qiang and LI Binglei
  2022,74(5):37-43 [Abstract]  [View PDF(2.17 M)]
  
Water rock reaction plugging mechanism of acid leaching uranium in Bayanwula uranium deposit
  LIU Yazhou,LUO Yue,LI Xun,WANG Bing and LIU Chunyu
  2022,74(5):44-51 [Abstract]  [View PDF(1.17 M)]
  
Research and practice of cutting groove scheme for sublevel caving under the condition of soft and broken rock mass
  LI Yanlong,TAN Baohui,WANG Yongding,GONG Zhen,MA Guohu and ZHONG Lipeng
  2022,74(5):52-60 [Abstract]  [View PDF(2.02 M)]
  
Analysis of safety and stability of goaf with stage open stoping method with subsequent filling in an iron mine
  KAN Mingbao,WU Yonggang and WANG Yanchao
  2022,74(5):61-67 [Abstract]  [View PDF(6.07 M)]
  

Mining Engineering & Safety

Research and practice on safe and efficient mining scheme of upward ultra-high drift filling in broken medium-thick deposit
  ZHANG Bao
  2022,74(5):68-73 [Abstract]  [View PDF(2.01 M)]
  
Return air characteristics and optimization of two-wing diagonal ventilation system
  PENG Yun and LI Kaiwen
  2022,74(5):74-78 [Abstract]  [View PDF(1.13 M)]
  
Experiment on critical threshold value of rainfall induced by natural caving method for underground debris flow
  LI Zhijun,NIU Xiangdong,ZENG Qingtian,HOU Kepeng,LI Zhengrong,WU Ming,PENG Zhang and WEI Yinhong
  2022,74(5):79-85 [Abstract]  [View PDF(3.02 M)]
  
Application analysis on new utility drainage mode in tailings pond expansion project
  LI Daoming,WANG Mingwen,WU Guogao,LUO Minjie and XIAO Wencan
  2022,74(5):86-89 [Abstract]  [View PDF(2.30 M)]
  
Stability analysis of tailings dam after heightening and capacity expansion based on Geo-studio
  WANG Feng,YANG Yong,WANG Yuchi,WANG Xinrong,HU Jun and YANG Bin
  2022,74(5):90-98 [Abstract]  [View PDF(2.29 M)]
  
Study on slope stability of large deep concave open-pit mine and application of intelligent monitoring system
  ZHU Jipeng,SU Huaibin,ZHAO Xuyang,SUN Yanyan and WU Hao
  2022,74(5):99-105 [Abstract]  [View PDF(3.75 M)]
  

Rock Mechnics

Study on shear creep test and constitutive model of soft rock under repeated water/air pressure cycle
  HU Bin,HUANG Lianghui,DING Jing,LI Jing,CUI Kai and LIU Ji
  2022,74(5):106-115 [Abstract]  [View PDF(1.74 M)]
  
Rock strength prediction and cutting mining analysis based on rebound method
  YAO Shubiao,WU Maochao,WAN Peng,WANG Xinqiao,WANG Shaolei and CHEN Wenchao
  2022,74(5):116-121 [Abstract]  [View PDF(1.33 M)]
  
Variability test of physical and mechanical parameters of deep granite with occurrence depth
  CHANG Junsong
  2022,74(5):122-128 [Abstract]  [View PDF(1.05 M)]
  

Mining Environment

Discussion on scheme arrangement of backwater system in a valley tailings pond
  TANG Fei,ZHANG Tao,QIE Yongbo and CUI Xuan
  2022,74(5):129-133 [Abstract]  [View PDF(1.08 M)]
  
Application practice of "Three Lines One Permit" ecological environment zoning management and control achievements in Guangxi province
  YE Fan,GUO Quanzhi,QIU Xinxin,TIAN Yuanyuan,MU Jiangrong,DENG Wanquan and ZHANG Jing
  2022,74(5):134-139 [Abstract]  [View PDF(2.64 M)]
  

Comprehensive Utilization & Others

Comparative test of high-precision and fast surveying and mapping equipment in large-scale open-pit mine and research on corresponding schemes
  PANG Fan,CHEN Kai,ZHANG Da,YU Lewen,LI Hanchen and YANG Yuzhu
  2022,74(5):140-147 [Abstract]  [View PDF(8.25 M)]
  
The Research onAutomatic Weighing High-Precision Model &Multiple Influence Factors of Load Haul Dumper
  WANG Kai,LI Hengtong,WANG Zhenqi,YANG Zhihai,GAO Zeyu and ZHANG Yuanqing
  2022,74(5):148-154 [Abstract]  [View PDF(1.50 M)]
  
Design of new-type rock drilling hoisting suspension system for 2 000 m large diameter ultra-deep shaft
  ZHAO Xingdong,WU Tong,LI Wenguang and DENG Yaozeng
  2022,74(5):155-159 [Abstract]  [View PDF(1.24 M)]
  

Mining Geology

Mineral characteristics of Baisong Pb-Zn deposit in eastern Guizhou province and their geological significance
  CHENG Yong,HU Yuzhao,CUI Miao,NIE Qi,XU Saihua and FAN Huijun
  2022,74(5):160-172 [Abstract]  [View PDF(10.51 M)]
  
Ore-controlling regularity of tectonic stress field and ore-prospecting direction in Huangshaping-Baoshan ore field, southern Hunan
  FU Yuxin,ZHAO Dong and HAN Runsheng
  2022,74(5):173-188 [Abstract]  [View PDF(12.48 M)]