###
DOI:
本文二维码信息
码上扫一扫!
基于3D-σ有限元法的采场结构参数优化
(长沙矿山研究院有限责任公司)
Optimization of stope structure parameters based on 3D-σ finite element method
(Changsha Institute of Mining Research Co., Ltd.)
摘要
相似文献
本文已被:浏览 127次   下载 0
投稿时间:2019-01-07    修订日期:2019-01-24
中文摘要: 某地下矿山由于采用固定的采场结构参数,导致开采过程中采场结构不能适应开采应力环境的变化,采场顶板及围岩垮冒现象时有发生,给井下生产带来了严重的安全隐患。根据矿山的矿体赋存特征和开采技术条件,采用3D-σ有限元分析软件对矿山可能采用的四种采场结构参数方案,在不同埋藏深度时的稳定性进行了数值模拟研究,获得了不同埋藏深度时的最佳采场结构参数,为矿山的采场结构设计提供了理论支撑。
Abstract:Due to the fixed stope structure parameters of an underground mine, the structural of the stope in the mining process can not adapt to the change of the mining stress environment. The roof and surrounding rock caving phenomenon occurs frequently, which brings serious safety hidden dangers to underground production.According to the ore occurrence characteristics and mining technical conditions of the mine, the 3D-σ finite element analysis software is used to simulate the stability of the four stope structure parameters schemes of the mine. The stability of the four stope structural parameters schemes at different burial depths is numerically simulated, and the optimum stope structural parameters at different burial depths are obtained, which provides theoretical support for the stope structural design of the mine.
文章编号:20190107001     中图分类号:    文献标志码:
基金项目:
Author NameAffiliationPostcode
OU Renze Changsha Institute of Mining Research Co., Ltd. 410012
引用文本:


我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号