中文摘要: 上向水平分层充填法适用于各种倾斜角度、以及各种厚度的矿体开采,在矿山领域得到广泛应用;然而该方法矿房安全跨度的确定一直是矿山开采设计的难题。本文结合Mathews稳定图法和数值计算法,先通过Mathews稳定图法确定矿房最大安全跨度,然后通过数值软件进行模拟分析,确定矿房稳定性,从而得出矿房的合理跨度,为上向水平分层充填法矿房跨度的确定提供依据。
中文关键词: Mathews稳定图 矿房跨度 矿房稳定性
Abstract:The upward horizontal layered filling method is suitable for mining of various angles and various thicknesses. It has been widely used in the mining field. However, the determination of the safe span of the mine has always been a difficult problem in mining design. Combining Mathews stability diagram method and numerical calculation method, this paper first determines the maximum safety span of the mine through Mathews stability diagram method, and then carries out simulation analysis by numerical software to determine the stability of the mine, thus obtaining a reasonable span of the mine. The horizontal stratified filling method provides a basis for determining the span of the mine.
keywords: Mathews stability diagram mine span mine stability
文章编号:20181202001 中图分类号: 文献标志码:
基金项目:
作者 | 单位 | 邮编 |
罗瑞* | 福州大学紫金矿业学院 | 510000 |
马锟辉 | 紫金矿业集团股份有限公司 |
Author Name | Affiliation | Postcode |
LuoRui | College of ZiJin Mining, Fuzhou University | 510000 |
马锟辉 |
引用文本: