###
DOI:
本文二维码信息
码上扫一扫!
上向水平分层充填法矿房跨度的确定及采场稳定性分析
(1.福州大学紫金矿业学院;2.紫金矿业集团股份有限公司)
Determination of Span Span and Analysis of Stope Stability in Upward Horizontal Layered Filling Method
摘要
相似文献
本文已被:浏览 90次   下载 0
投稿时间:2018-12-02    修订日期:2018-12-06
中文摘要: 上向水平分层充填法适用于各种倾斜角度、以及各种厚度的矿体开采,在矿山领域得到广泛应用;然而该方法矿房安全跨度的确定一直是矿山开采设计的难题。本文结合Mathews稳定图法和数值计算法,先通过Mathews稳定图法确定矿房最大安全跨度,然后通过数值软件进行模拟分析,确定矿房稳定性,从而得出矿房的合理跨度,为上向水平分层充填法矿房跨度的确定提供依据。
Abstract:The upward horizontal layered filling method is suitable for mining of various angles and various thicknesses. It has been widely used in the mining field. However, the determination of the safe span of the mine has always been a difficult problem in mining design. Combining Mathews stability diagram method and numerical calculation method, this paper first determines the maximum safety span of the mine through Mathews stability diagram method, and then carries out simulation analysis by numerical software to determine the stability of the mine, thus obtaining a reasonable span of the mine. The horizontal stratified filling method provides a basis for determining the span of the mine.
文章编号:20181202001     中图分类号:    文献标志码:
基金项目:
Author NameAffiliationPostcode
LuoRui College of ZiJin Mining, Fuzhou University 510000
马锟辉  
引用文本:


我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号