###
DOI:
有色金属(矿山部分):2024,76(4):12-20
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
多目标金属露天矿配矿装载点选取问题及求解算法
顾清华1,2,3,张文雅1,2,王 倩1,2
((1.西安建筑科技大学 管理学院,西安 710055;2. 西安市智慧工业感知计算与决策重点实验室, 西安 710055;3.西安建筑科技大学 资源工程学院,西安 710055))
Loading point selection problem and solving algorithm of multi-target metal open-pit mine
GU Qinghua1,2,3, ZHANG Wenya1,2, WANG Qian1,2
((1. School of Management, Xi''an University of Architecture & Technology, Xi''an 710055, China; 2. Xi''an Key Laboratory for Intelligent Industrial Perception, Calculation and Decision, Xi''an 710055, China; 3. School of Resources Engineering, Xi''an University of Architecture & Technology, Xi''an 710055, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 159次   下载 143
投稿时间:2024-03-13    修订日期:2024-04-22
中文摘要: 目的:为了减少矿产资源浪费,提高贫矿的利用率,针对大型金属露天矿多装载点配矿问题,综合考虑矿石剩余量不足、铲装设备数量有限等因素对配装载点选取的影响,以品位偏差最小、生产成本最小、车辆总排队时间最短为目标建立配矿装载点选取模型。方法:采用二维矩阵整数编码法,并设计一种基于随机片段交叉与特定变异算子相结合的间接二次遗传优化算法对模型进行求解。结果:以国内某大型金属露天矿实际生产数据为例进行仿真实验,结果表明:所得出的装载点选取方案在受铲装设备数量限制、优先开采矿石剩余量相对较少装载点的条件下,仍能满足配矿计划需求。结论:所提模型、算法能普遍适用于大型金属露天矿山开采,使装载点的矿石得到充分利用。意义:提高了企业的经济效益和矿山整体开采效率。
Abstract:Purpose: In order to reduce the waste of mineral resources and improve the utilization rate of lean ore, considering the influence of insufficient ore surplus and the limited amount of shovel loading equipment on the selection of loading points in large metal open-pit mines, a loading point selection model was established with the objectives of minimum grade deviation, minimum production cost and shortest total queuing time of vehicles. Method: A two-dimensional matrix integer coding method is adopted, and an indirect quadratic genetic optimization algorithm based on random fragment crossing and specific mutation operators is designed to solve the model. Result: Taking the actual production data of a large metal open-pit mine in China as an example, the simulation results show that the loading point selection scheme can still meet the requirements of the ore allocation plan under the condition that the number of shovel loading equipment is limited and the remaining ore of priority mining is relatively small. Conclusion: The proposed model and algorithm can be generally applied to large-scale metal open-pit mining, and the ore at the loading point can be fully utilized. Significance: It improves the economic benefit of the enterprise and the overall mining efficiency of the mine.
文章编号:     中图分类号:    文献标志码:
基金项目:国家自然科学基金项目(52374135、52074205);陕西省科技计划项目(2023-CX-TD-12)
引用文本:
顾清华,张文雅,王 倩.多目标金属露天矿配矿装载点选取问题及求解算法[J].有色金属(矿山部分),2024,76(4):12-20.
GU Qinghua,ZHANG Wenya,WANG Qian.Loading point selection problem and solving algorithm of multi-target metal open-pit mine[J].NONFERROUS METALS(Mining Section),2024,76(4):12-20.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号