###
DOI:
有色金属(矿山部分):2025,77(1):65-71,81
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
某深凹露天矿复杂边坡稳定性数值模拟及加固措施研究
梁源贵1,周宗红2*,侯廷凯2,黄耀春3,孙慧珍2
((1.鹤庆北衙矿业有限公司,云南 大理 671000;2.昆明理工大学,昆明650093;3.云南地矿建设工程有限责任公司,昆明650200))
Numerical simulation of complex slope stability and reinforcement measures in a deep concave open-pit mine
LIANG Yuangui 1, ZHOU Zonghong 2*, HOU Tingkai 2, HUANG Yaochun 3, SUN Huizhen 2
((1.Heqing Beiya Mining Co., Ltd., Dali Yunnan 671000, China; 2. Kunming University of Science and Technology, Kunming 650093, China; 3. Yunnan Geological and Mineral Construction Engineering Co., Ltd., Kunming 650200, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 447次   下载 678
投稿时间:2023-12-01    修订日期:2023-12-06
中文摘要: 某金矿现阶段采用露天开采的方式进行生产,已形成高度约400m的边坡,西部边坡等区域受多个交汇断层的影响发生了失稳滑移,严重威胁矿山安全生产。随着开采深度的不断增大,边坡稳定性进一步下降,急需对边坡的稳定性及支护手段展开研究。本文在相关室内试验的基础上,采用数值模拟方法,建立了采场三维立体模型,从应力、位移和剪切应变增量的角度对研究区域扩帮至最终境界过程中的稳定性进行分析,并提出相应的加固方案。结果表明:随着开挖的持续,受断层、自重地+下水+地震的影响,露天边坡逐渐进入欠稳定状态,最终失稳;当在断层区域采用锚固段长度12m、自由段长度分别为25m、36m及37m、倾角20°、间距4m的预应力锚索进行加固后边坡可以保持稳定。研究结果为矿山设计和生产提供理论依据。
中文关键词: 露天开采  边坡稳定  数值模拟  FLAC3D  支护
Abstract:At present, a certain gold mine adopts open-pit mining for production, which has formed a slope with a height of about 400m. The western slope and other areas have been affected by multiple intersecting faults and have experienced instability and sliding, seriously threatening the safety of mining production. As the mining depth continues to increase, the stability of the slope further decreases, and there is an urgent need to conduct research on the stability and support methods of the slope. On the basis of relevant indoor experiments, this article uses numerical simulation methods to establish a three-dimensional model of the mining area. From the perspectives of stress, displacement, and shear strain increment, the stability of the study area during the expansion process to the final boundary is analyzed, and corresponding reinforcement schemes are proposed. The results show that as excavation continues, the open-pit slope gradually enters an unstable state due to the influence of faults, self weight ground+groundwater+earthquake, and ultimately becomes unstable; When prestressed anchor cables with anchoring section length of 12m, free section length of 25m, 36m, and 37m, inclination angle of 20 °, and spacing of 4m are used in the fault area for reinforcement, the slope can remain stable. The research results provide theoretical basis for mine design and production.
文章编号:     中图分类号:TD852    文献标志码:
基金项目:动静组合加载诱发滑移型岩爆机理研究(52264019)
引用文本:
梁源贵,周宗红,侯廷凯,黄耀春,孙慧珍.某深凹露天矿复杂边坡稳定性数值模拟及加固措施研究[J].有色金属(矿山部分),2025,77(1):65-71,81.
LIANG Yuangui,ZHOU Zonghong,HOU Tingkai,HUANG Yaochun,SUN Huizhen.Numerical simulation of complex slope stability and reinforcement measures in a deep concave open-pit mine[J].NONFERROUS METALS(Mining Section),2025,77(1):65-71,81.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号