###
有色金属(矿山部分):2023,75(1):20-25
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
长安金矿无底柱分段崩落法首采中段损失贫化控制方法
张秀华1,周宗红1,丁文俊1 ,刘永文2 ,鄢 波2
((1.昆明理工大学 国土资源工程学院,昆明 650093; 2.云南黄金集团 金平长安矿业有限公司,云南 金平 661508))
Depletion control method for loss in the middle section of first mining by bottomless column segmental crumbling method at Chang''an gold mine
ZHANG Xiuhua1, ZHOU Zonghong1, DING Wenjun1, LIU Yongwen2 ,YAN Bo2
((1. Faculty of Land Resources Engineering, Kunming University of Science and Technology, Kunming 650093, China; 2. Jinping Changan Mining Co., Ltd., Jinping County Yunnan 661508, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 509次   下载 424
投稿时间:2022-07-14    修订日期:2022-08-19
中文摘要: 长安金矿露天转入地下开采,采用无底柱分段崩落法,出现覆盖层形成困难的问题,且现场矿岩物理力学性质相似,较难区分,使得矿石损失贫化不易控制。为此,设计3种试验方案对3个分段在不同出矿量、不同贫化率条件下展开室内放矿试验研究,优选放矿方案并提出了量化控制方法。试验结果表明:方案1视在回收率和回贫差均高于方案2;其留下的矿石垫层厚度最大,且废石混入率、矿石贫化率均比方案2和方案3低,综合分析方案1为最优方案。首采分段出矿控制有利于保持矿岩界面均匀下降,能够有效缓解覆盖层厚度不足的问题。分析方案1第二分段可知,放出矿量控制在65%~70%时,可以有效地降低矿石贫化率;结合矿石当次品位和当次贫化率随放出矿量的变化关系式,提出了对放出矿量进行相应的量化控制从而有效地降低矿石损失贫化的方法。试验结果在长安金矿1 518、1 509、1 500 m等分段得到实践应用,效果良好,对类似矿山有一定的参考意义。
Abstract:During the process of open-pit to underground mining in Chang''an gold mine, the bottomless column segmental crumbling method is used, the problem of difficult formation of overburden layer, and the physical and mechanical properties of the site ore rocks are similar, more difficult to distinguish, and making ore loss depletion is not easy to control. To the end, three experimental schemes were designed to carry out indoor release experiments for three segments with different ore output and depletion rates, to optimize the release scheme, and to propose a quantitative control method. The experimental results show that the apparent recovery rate and poor recovery difference of Scheme 1 are higher than those of Scheme 2; the thickness of the ore bedding left by it is the largest, and the waste rock mixing rate and ore depletion rate are lower than those of Scheme 2 and Scheme 3, and Scheme 1 is the optimal scheme in a comprehensive analysis. The first mining section out of control is conducive to maintaining a uniform descent of the ore rock interface, which can effectively alleviate the problem of insufficient overburden thickness. The analysis of the second section of Option 1 shows that the ore release controlled at 65%-70% can effectively reduce the ore depletion rate; combined with the variation equation of current grade and current depletion rate of ore with the ore release, the method of quantifying the ore release control accordingly to effectively reduce the ore loss depletion is proposed. The experimental results were practically applied in each mining site of 1 518 m, 1 509 m, and 1 500 m sections of Chang''an gold mine, with good results, which have reference significance for similar mines.
文章编号:     中图分类号:    文献标志码:
基金项目:国家自然科学基金资助项目(51864023)
引用文本:
张秀华,周宗红,丁文俊,刘永文,鄢 波.长安金矿无底柱分段崩落法首采中段损失贫化控制方法[J].有色金属(矿山部分),2023,75(1):20-25.
ZHANG Xiuhua,ZHOU Zonghong,DING Wenjun,LIU Yongwen,YAN Bo.Depletion control method for loss in the middle section of first mining by bottomless column segmental crumbling method at Chang''an gold mine[J].NONFERROUS METALS(Mining Section),2023,75(1):20-25.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号