某加高扩容尾矿库三维静力敏感性及地震反应数值分析
陶东良1,王 硕2,吴蒙蒙3,宁 伟3,徐力群2,孙一清2,冯亚新2
((1.长沙有色冶金设计研究院有限公司,长沙 410011; 2.河海大学 水利水电学院,南京 210098; 3. 洛阳栾川钼业集团股份有限公司,河南 洛阳 471500))
Three dimensional static sensitivity and seismic response numerical analysis of a tailings pond with increased storage capacity
TAO Dongliang1, WANG Shuo2, WU Mengmeng3, NING Wei3, XU Liqun2, SUN Yiqing2, FENG Yaxin2
((1.Changsha Engineering & Research Institute Co., Ltd. of Nonferrous Metallurgy, Changsha 410011, China;2. College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China; 3. Luanchuan Environmental Protection Bureau, Luoyang Henan 471500, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 8次   下载 9
投稿时间:2022-03-18    修订日期:2022-04-01
中文摘要: 为验证某复杂地质条件下尾矿库加高扩容设计方案的合理性,采用非线性有限元程序建立了初期坝、堆积坝以及坝基的三维有限元模型,首先分析了当堆积坝各料区均采用设计参数时,坝体在自重及上游沉积滩水压力作用下的静力位移、应力和应力水平,然后考虑到实际排矿堆积过程中存在的不确定性,对各层尾砂的主要变形模量进行了敏感性分析,最后采用动力时程分析法对坝体进行动力稳定性分析。结果表明,数值模拟结果符合工程实际,工程加高扩容设计方案较为合理,坝体不会出现因地震作用所导致的水平或垂直向裂缝以及沉积池水漫顶情况。研究成果可为设计及施工方案提供一定的理论依据。
Abstract:To verify the rationality of the design scheme of heightening and capacity expansion of tailings pond in a complex geological condition, the three-dimensional finite element models of an initial dam, accumulation dam and dam foundation are established by using the nonlinear finite element program. Firstly, the static displacement, stress, and stress level of the dam body under the action of self weight and upstream sedimentary beach water pressure are analyzed when the design parameters are adopted in each material area of the accumulation dam, and then the uncertainty in the actual ore discharge and accumulation process is considered, the sensitivity analysis of the main deformation modulus of tailing sand in each layer is carried out. Finally, the dynamic stability of the dam is analyzed by using the dynamic time history analysis method. The results show that the numerical simulation results are in line with the engineering practice, the engineering heightening and capacity expansion design scheme is more reasonable, and there will be no horizontal or vertical cracks in the dam body and overtopping of sedimentary pool water caused by the earthquake. The research results can provide a certain theoretical basis for the design and construction scheme.
文章编号:     中图分类号:TV223.7; TV649    文献标志码:
基金项目:
引用文本:
陶东良,王 硕,吴蒙蒙,宁 伟,徐力群,孙一清,冯亚新.某加高扩容尾矿库三维静力敏感性及地震反应数值分析[J].有色金属(矿山部分),2022,74(4):79-87.
TAO Dongliang,WANG Shuo,WU Mengmeng,NING Wei,XU Liqun,SUN Yiqing,FENG Yaxin.Three dimensional static sensitivity and seismic response numerical analysis of a tailings pond with increased storage capacity[J].NONFERROUS METALS(Mining Section),2022,74(4):79-87.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysks@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号