机械化矿山高应力软岩巷道支护实践
陈建新1, 胡亚飞2, 汪凤伟1, 陈偶1, 王能跃1
(1.贵州锦丰矿业有限公司;2.北京科技大学)
Supporting practice of high geo-stress soft rock roadway in mechanized mine
Chen Jian-Xin1, Hu Ya-Fei2, Wang Feng-Wei1, Chen Ou1, Wang Neng-yue.1
(1.Guizhou jinfeng mining co,LTD,Zhenfeng Guizhou;2.University of science and technology Beijing)
摘要
图/表
参考文献
相似文献
本文已被:浏览 813次   下载 753
投稿时间:2020-04-20    修订日期:2020-04-22
中文摘要: 针对某矿深部开拓掘进期间遇到的以砂岩泥岩互层为主的软岩巷道支护难题,在对其变形特征分析的基础上,通过岩体调查、膨胀性试验、地应力测试、松动圈理论分析、锚杆强度试验等策略,结合实践经验,认为岩性差、破碎带影响和复杂地质构造引起的地应力变化从而引起原支护系统强度不足是造成大面积巷道失稳的主要原因。基于兼顾凿岩台车设备效率需求而优选支护锚杆,并参考送松动圈、组合拱理论计算调整锚杆参数,确定间排距1.1×1.1m、长2.8m的树脂锚杆+管缝注浆锚杆+湿喷纤维混凝土+钢网为主要支护方案。通过设置收敛变形监测点进行长期监测显示,总体巷道顶、帮、底收敛量均控制在20-30mm左右,巷道基本保持稳定。
中文关键词: 高应力  软岩  巷道支护  机械化矿山
Abstract:For the sandstone mudstone interbedded soft rock roadways support problem encountered during the tunneling process of deep level roadway in a certain Mine, analysis on its deformation characteristics were conducted, and several strategies were used to identify the reason of such deformation. The strategies consisted of rock mass investigation, rock sample swelling test, geo-stress test, loose ring theory analysis, and anchor strength test. Combining with practical experience, it’s considered that the large area of roadway deformation mainly caused by insufficient support strength sourced from poor rock condition, broken zone and high geo-stress induced by complicated tectonic compression. In view of the high efficiency of rock drilling equipment, the supporting bolt was selected, and the parameters of the bolt were calculated and adjusted by referring to the theory of Loose Ring and Composite Arch, and the main supporting scheme was determined to be resin bolt + grouting split set+ fiber reinforced wet shotcrete+ steel mesh with the bolt spacing of 1.1×1.1m and the bolt length of 2.8m. Long-term monitoring by setting convergence deformation monitoring points showed that the overall convergence of the back, side and base of the roadway were controlled at about 20-30mm, and the roadway is now basically stable.
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
陈建新,胡亚飞,汪凤伟,陈偶,王能跃.机械化矿山高应力软岩巷道支护实践[J].有色金属(矿山部分),2020,72(3):39-44.
Chen Jian-Xin,Hu Ya-Fei,Wang Feng-Wei,Chen Ou,Wang Neng-yue..Supporting practice of high geo-stress soft rock roadway in mechanized mine[J].NONFERROUS METALS(Mining Section),2020,72(3):39-44.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号