中文摘要: 矿山在深部开拓时,平巷掘进遇到花岗闪长岩体,采用矿山常用的掘进爆破设计方案进行施工,效果很不理想。通过多次现场试验研究,调整优化了爆破设计方案,高效地穿过该段花岗闪长岩体。在改良掘进爆破设计的同时,确保了工程按时保质保量完成,更为同类岩体掘进爆破施工提供了参考借鉴。
Abstract:Effects of the frequently-used design scheme of tunneling blasting are very unsatisfactory when the mine is deep exploited and encountering the granodiorite in laneway tunnelling. Through many field test studies, the blasting design scheme was adjusted and optimized, efficiently crossing this section of granodiorite, which not only improved the design of driving blasting, but also ensured the project completing timely quality and quantity, and even provided a good reference for driving blasting construction of similar rock mass.
keywords: laneway tunnelling granodiorite field test blasting design
文章编号: 中图分类号: 文献标志码:
基金项目:
引用文本:
王振乾,芮新志.花岗闪长岩体中的掘进爆破设计方案优化[J].有色金属(矿山部分),2019,71(6):19-23.
WANG Zhenqian,RUI Xinzhi.Optimization of design scheme of tunneling blasting in Granodiorite[J].NONFERROUS METALS(Mining Section),2019,71(6):19-23.
王振乾,芮新志.花岗闪长岩体中的掘进爆破设计方案优化[J].有色金属(矿山部分),2019,71(6):19-23.
WANG Zhenqian,RUI Xinzhi.Optimization of design scheme of tunneling blasting in Granodiorite[J].NONFERROUS METALS(Mining Section),2019,71(6):19-23.