有色金属(矿山部分):2019,71(5):64-71
本文二维码信息
码上扫一扫!
某大型尾矿库排洪系统水工模型试验研究
(1.(1. 北京国信安科技术有限公司,北京 100160;2. 北京科技大学 土木与资源工程学院,北京 100083;3. 北京矿冶科技集团有限公司,北京 100160))
Hydraulic model test of flood discharge system of a large tailings reservoir
(1.(1. Beijing Guoxin Anke Technology Co., Ltd., Beijing 100160, China;2. School of Civil and Resource Engineering, University of Science and Technology Beijing, Beijing 100083, China;3. BGRIMM Technology Group, Beijing 100160, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 224次   下载 0
    
中文摘要: 为保证排洪系统安全、可靠运行,本文通过制作尾矿库排洪系统水工模型,模拟1#~3#排水竖井逐级运行方式下,排水竖井的溢流特性及其他工程水力学问题,研究排洪系统在最不利运行工况下主、支洞交汇区泄洪隧洞内流态、壅高及压力分布规律,检验库内排洪系统和库外主泄洪隧洞是否存在空化、气蚀等现象,校核各泄洪系统的泄流能力,可为尾矿库或类似工程设计和应用提供参考。
Abstract:In this paper, in order to ensure that the flood discharge system works safely and reliably, the hydraulic model of the flood discharge system of tailings reservoir was made to simulate the overflow behavior and other engineering hydraulic problems of the drainage shaft under the stepwise operating mode of 1#—3# drainage shaft. Flow state, run up height and pressure distribution law of the flood discharge system in flood discharge tunnel of confluence area of main and branch tunnels under the most unfavorable operating conditions were studied. Whether there were cavitation in the flood discharge system inside the reservoir and the main flood discharge tunnel outside the reservoir were tested, andthe discharge capacity of each flood discharge system was checked. This work can provide reference for the design and application of tailings reservoir or similar projects.
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
杜振斐1,2,武伟伟3,吴永刚1.某大型尾矿库排洪系统水工模型试验研究[J].有色金属(矿山部分),2019,71(5):64-71.
DU Zhenfei1,2,WU Weiwei3,WU Yonggang1.Hydraulic model test of flood discharge system of a large tailings reservoir[J].NONFERROUS METALS(Mining Section),2019,71(5):64-71.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysks@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号