中文摘要:
      国内外深井矿山越来越多,深井提升系统在矿山的开采中占有重要的地位。本文对南非某矿山深井提升系统进行方案比较,各方案分别从基建投资、生产期间电耗及钢丝绳消耗几方面来对比,将后期运营成本折现,采用费用现值法进行综合比较,并通过SWOT分析各方案,最后综合SWOT分析和费用现值分析结果,选择最优方案。
英文摘要:
      Deep mine hoisting system has played an important role in mining, as more and more deep mines being explored at home and abroad. This paper compared the schemes of deep mine hoisting system in a mine in South Africa. The schemes were compared from the aspects of capital cost, power consumption during production and wire rope consumption. With the late operating cost being discounted, the cost present value method was used to make a comprehensive comparison. Finally, combined with the results of SWOT analysis and cost present value analysis, the optimal scheme was selected.
查看全文  查看/发表评论  下载PDF阅读器
关闭