###
DOI:
有色金属(矿山部分):2014,66(4):-
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
基于不同地压监测尺度实现矿柱安全回采
蔡永顺,张达,张晓朴,袁本胜,张君
(北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院)
Realizing ore pillar stoping safely based on different ground pressure monitoring scales
caiyongshun,张达,张晓朴,袁本胜 and 张君
(Beijing General Research Institute of Mining and Metallurgy,,,,)
摘要
图/表
参考文献
相似文献
本文已被:浏览 681次   下载 681
投稿时间:2014-02-12    修订日期:2014-02-27
中文摘要: 单一的地压监测尺度已经不能满足矿柱回采过程中对不同尺度岩体安全监测的需求,针对该问题本文提出了“宏观与微观结合,整体与局部协同”的“最优化”原则,采用微震、应力、应变、位移等不同监测尺度的地压监测技术对某磷矿试验盘区矿柱回采过程中的地压活动进行监测,并指导矿山安全回采矿柱,取得了良好的效果。
Abstract:Single ground pressure monitoring scale can"t meet the needs of safety monitoring of rock mass of different scales during the process of ore pillar stoping. Aimed at the problem, the "optimization" principle that "macro and micro combination, whole and local coordination" is proposed in this paper. Ground pressure monitoring technologies of different scales such as microseismic, stress, strain and displacement are used to monitor the ground pressure activities of test panel of a phosphate ore during the process of ore pillar stoping, and guide the mine stoping ore pillar safely, which has achieved a good result.
文章编号:     中图分类号:    文献标志码:
基金项目:“十二五”国家科技支撑计划(2012BAK09B03);国家国际科技合作专项(2011DFA71990); 科研院所技术开发研究专项(2012EG115003)。
引用文本:
蔡永顺,张达,张晓朴,袁本胜,张君.基于不同地压监测尺度实现矿柱安全回采[J].有色金属(矿山部分),2014,66(4):.
caiyongshun,张达,张晓朴,袁本胜,张君.Realizing ore pillar stoping safely based on different ground pressure monitoring scales[J].NONFERROUS METALS(Mining Section),2014,66(4):.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号