中文摘要: 针对铜矿峪矿530 m中段有轨运输设计,对所提出的6 m3底卸式矿车运输方案进行了分析和计算,从而为确定方案提供正确的依据。
Abstract:According to the transportation design pattern of 530 m middle section in Tongkuangyu mine, the transportation pattern of 6 m3 bottom-dump tramcar is analyzed and calculated in this paper, in order to provide correct references for the determination of project.
文章编号: 中图分类号: 文献标志码:
基金项目:
Author Name | Affiliation |
ZHANG Yongming | Tongkuangyu Mine, North Copper Co., LTD, Yuanqu 043706, Shanxi, China |
引用文本:
张永明.井下有轨运输车辆的选型计算[J].有色金属(矿山部分),2011,63(2):47-48.
ZHANG Yongming.Selection calculation of the underground track transportation vehicle[J].NONFERROUS METALS(Mining Section),2011,63(2):47-48.
张永明.井下有轨运输车辆的选型计算[J].有色金属(矿山部分),2011,63(2):47-48.
ZHANG Yongming.Selection calculation of the underground track transportation vehicle[J].NONFERROUS METALS(Mining Section),2011,63(2):47-48.