###
有色金属(矿山部分):2017,69(1):10-13
本文二维码信息
码上扫一扫!
大尹格庄金矿深部采场矿柱稳定性分析 与参数优化
((招金矿业股份有限公司 大尹格庄金矿,山东 招远 265414))
Pillar stability analysis and parameters optimization in the deep stope of Yingezhuang Gold Mine
(( Dayingezhuang Gold Mine, Zhaojin Mining Co., Ltd., Zhaoyuan Shandong 265414, China))
摘要
图/表
参考文献
相似文献
本文已被:浏览 1264次   下载 0
    
中文摘要: 以大尹格庄金矿深部采场8204为工程依托,在合理的采场跨度范围内设计了3种矿柱尺寸方案,并分别建立三维数值模型。通过对比分析不同方案的采场顶板及矿柱的位移及塑性区,研究矿柱由稳定状态向临界失稳状态的演化过程。引入点安全系数法对采场及其点柱进行安全度评价,得出最佳安全矿柱尺寸,并通过Lunder经验公式验证其矿柱尺寸合理性。分析结果确定采场结构参数为:采场跨度约为12 m,矿柱宽度约为6 m。
Abstract:Based on the No.8204 deep stope of Yingezhuang Gold Mine, three different schemes of pillar size are designed and 3D numerical models are built in the reasonable stope span range. Through comparative analysis of the displacement and plastic zone about stope roof and pillar of different schemes, the process of pillars from stable state to limit equilibrium state is studied. The safety degree of the stope roof and pillar is evaluated by point safety factor method, and the pillar safety width is obtained. Then the reasonable pillar size is verified through Lunder empirical formula. According to the results calculated by numerical simulation and point safety factor method, the pillar width is 6 m, and the width of stope is 12 m.
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
张君鹏,王启健,夏自锋.大尹格庄金矿深部采场矿柱稳定性分析 与参数优化[J].有色金属(矿山部分),2017,69(1):10-13.
ZHANG Junpeng, WANG Qijiang, XIA Zifeng,ZHANG Junpeng, WANG Qijiang, XIA Zifeng,ZHANG Junpeng, WANG Qijiang, XIA Zifeng.Pillar stability analysis and parameters optimization in the deep stope of Yingezhuang Gold Mine[J].NONFERROUS METALS(Mining Section),2017,69(1):10-13.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299757

杂志信息

期刊简介

相关下载

联系我们

电话:010-63299757

传真:010-63299754

QQ:XXXXXXX

Email:ysjsks@sina.com;ysjsks@163.com

邮编:100160

地址:北京市南四环西路188号总部基地十八区23号楼

关注微信公众号